BANGOR DAILY NEWS • October 19, 2022
After more than a decade, the Belfast Harbor Walk will soon be complete when the two ends of the walkway are joined. That’s part of the final phase of the project which began around 2010. The Belfast Public Works department is fixing issues with the deteriorating sidewalk as well as adding an additional pathway and light posts on a previously unconstructed portion of the Harbor Walk. Concrete pavement is being replaced with asphalt as the walkway is expanded from 6 feet wide to 10 feet wide.